AIMS Plotter for StayVS Tasks — 2D Task Planning Grid (Pre-Iron Rod)#
A 4-page introduction to the AIMS Plotter — the 2D task planning grid that plots Impact (Kick k0–k9) against urgency (Speed s0–s9) for prioritizing work.
Download the original document (PDF)
AIMS Plotter for StayVS Tasks — PDF (1.3 MB) — 4 pages, Jonah License with CC0 Public Domain
Filename: evx-post-aims-plotter-for-stayvs-tasks-2020-pre-ironrod-iv_llol_qqr7_2020m03d14-4page.pdf
— Overview AI-generated by dv_ClaOp46Max_ExhH_2026m04d16 —Start—
Abstract#
This 4-page document introduces the AIMS Plotter (AP) — a 2D task management grid that is the predecessor to the AIMS system used throughout the POST framework. This is a pre-Iron Rod version (2020).
Page 1 (AHA-1): A simplified blank AIMS Plotter grid. The Y-axis maps Impact Kick (k0–k9) from Fashion/Individualize (k0) at the bottom to UltimateLead (k9) at the top. The X-axis maps Speed (s0–s9) from Whenever (s0) at the left to Now/ASAP (s9) at the right. A faint “Shabbat” watermark marks the Wait/Work boundary. Row and column headers show abbreviated labels for each level.
Page 2 (AHA-2): “How to use an AimsPlotter for Planning” — step-by-step instructions for using the grid to prioritize tasks, including how to measure AP quality and avoid overloading.
Page 3 (AHA-3): A filled example showing detailed descriptions in each cell of the grid, with versioning stages (Long-Term, MidTermFocus, ShortTerm, Recreate, CountDown, OverviewPlan, DecideTry, AlignFlow, NowFlow) mapped across the Speed axis, and impact categories (Fashion, KeepingPeace, BuildTrust, ImproveMore, QuestionIdeals, EssentialCore, PurgeProblem, GroundBreaking, etc.) on the Impact axis.
Page 4: A detailed empty template with full axis labels, the “IDEAL / FUTURE / POTENTIAL” column on the left margin, and “PastReality” anchor on the right, showing the complete coordinate system for task placement.
Key Concepts at a Glance#
AIMS Plotter |
A 2D grid plotting Impact (importance for long-term common good) against Speed (urgency to minimize learning opportunity cost) |
Impact Kick (k0–k9) |
10 levels from k0 (Fashion/Individualize) to k9 (UltimateLead), measuring importance for gentle kind reasonable outcomes OLT |
Speed (s0–s9) |
10 levels from s0 (Whenever) to s9 (Now/ASAP), measuring urgency to minimize learning opportunity cost |
Shabbat watermark |
The Wait/Work boundary visible in the grid, connecting task planning to the Shabbat cycle principle |
Broader Significance (Claude’s Assessment)#
The AIMS Plotter is the practical task management tool that makes the POST system usable for daily work. By mapping every task onto a 2D grid of impact and urgency, it provides a systematic alternative to flat TODO lists. The 10×10 grid gives fine-grained control while the named levels (EssentialCore, PurgeProblem, CountDown, etc.) provide semantic anchors. This pre-Iron Rod version shows the system before it was integrated into the full StayVS versioning framework.
Document Information#
Document ID |
AIMS Plotter for StayVS Tasks (Flying Scroll, transwarpkey/sta1-evx/) |
Author |
Laurence Loewe of Laodicea (LLoL) |
Date |
2020m03d14 |
Version |
iv_LLoL_QQr7_2020m03d14 |
Format |
4-page document (grid template + instructions + example) |
License |
Jonah License with CC0 Public Domain |
Part of |
Good News Pack MMv3, Flying Scroll / Transwarp Key / STa1-EVX |
PDF size |
1.3 MB |
WebP size |
328 KB |
Related documents:
STa1-EVX stadium overview (parent page with all 30 documents)
Iron Rod AHA Versioning (the later Iron Rod that integrates AIMS Plotter into StayVS)
DOISI 7Spirit Truth (the decision-support bases that AIMS feeds into)
— Overview AI-generated by dv_ClaOp46Max_ExhH_2026m04d16 —End—