Phase 2I-7: Phase 2I Closing#
Note
Path update needed if rerun (2026-03-25, Phase 2I-3). This prompt was deprecated and superseded by 2I-7a/2I-7b. The AHA doc path below has moved to the compiler directory.
Note
200K-token execution prompt. Copy-paste everything below the horizontal rule into a new Claude Code session.
Prerequisite: All Phase 2I prompts (2I-1 through 2I-6) must have completed. This is the final prompt in the Phase 2I sequence.
/clear /compact /effort max
You are executing Phase 2I-7 of the JUB OOv2 matheology project: closing Phase 2I. This session reviews all Phase 2I work, writes the closing llog, updates the index, and prepares the handoff to Phase 3.
STEP 0 — READ ALL REQUIRED FILES (DO THIS FIRST)#
ax1_A1. AHA DESIGN DOC: source/matheology/vv/jub/oov2/llog/aha-best-names-for-matheology-links.rst (New location: source/matheology/compiler/ww/5d-link-naming-matheology-aha.rst)
ax2_A2. PoR FIELD TESTING REPORT: source/matheology/vv/jub/oov2/llog/2I-por-field-testing.rst
ax3_A3. SKILL SPECIFICATION: source/matheology/vv/jub/oov2/llog/skill-compile-matheology.rst
ax4_A4. ADVERSARIAL STRESS-TEST REPORT: source/matheology/vv/jub/oov2/llog/2I-adversarial-stress-test.rst
ax5_A5. COMPILED EXPERT VIEW: source/matheology/compiled/axioms/expert.rst (New location per DD-b12: source/matheology/axioms/expert/)
ax6_A6. COMPILED EASY VIEW: source/matheology/compiled/axioms/easy.rst (New location per DD-b12: source/matheology/axioms/easy/)
ax7_A7. PUBLIC DOCUMENTATION (all 4 depth pages): source/matheology/naming-easy.rst source/matheology/naming-producer.rst source/matheology/naming-expert.rst source/matheology/naming-architect.rst
ax8_A8. ALL PHASE 2I PROMPTS: source/matheology/vv/jub/oov2/prompts/prompt_2I-1.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-2.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-3.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-4.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-5.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-6.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-7.rst
ax9_A9. LLOG INDEX: source/matheology/vv/jub/oov2/llog/index.rst
ax10_A10. DEBUG FILE: source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-phase1-prompts-reply-overviews-for-debugs.rst
ax11_A11. 2G-2H SUMMARY (previous phase closing, for format reference): source/matheology/vv/jub/oov2/llog/llog_2026m03d22_restructuring-2G-2H-stress-tests-summary-freeze.rst
STEP 1 — AUDIT ALL PHASE 2I DELIVERABLES#
Check that every expected deliverable exists and is complete:
From 2I-1 (Migration):
- [ ] All labels migrated from flat (
ax1) to model-prefixed (
pet-ax1)
- [ ] All labels migrated from flat (
[ ] All cross-references updated
[ ] Migration comments in affected files
[ ] Build passes with zero new warnings
From 2I-2 (PoR Field Testing):
[ ] Coverage matrix exists (elements × 45 fields)
[ ] Gap analysis complete
[ ] Extraction difficulty assessment complete
From 2I-3 (Compilation Skill):
[ ] Extraction matrix defined (45 fields × 5 depths)
[ ] Skill specification written
[ ] Stub templates created (5 audience depths)
From 2I-4 (First Compilation):
- [ ] Expert view exists at
compiled/axioms/expert.rst (New location per DD-b12:
axioms/expert/)
- [ ] Expert view exists at
- [ ] Easy view exists at
compiled/axioms/easy.rst (New location per DD-b12:
axioms/easy/)
- [ ] Easy view exists at
[ ] Compiled index with toctree
[ ] No duplicate labels
From 2I-5 (Adversarial Stress-Test):
[ ] Attack report exists
[ ] All BREACH items have proposed fixes
[ ] Overall assessment rendered
From 2I-6 (Public Documentation):
- [ ] 4 audience-depth pages exist (easy, producer, expert,
architect)
[ ] Navigation index exists (
naming.rst)[ ] Pages linked from matheology index
Record the audit result for each checklist item. If any item is incomplete, note it in the closing llog as INCOMPLETE with explanation.
STEP 2 — WRITE THE PHASE 2I CLOSING LLOG#
Create: source/matheology/vv/jub/oov2/llog/llog_2026m03d23_restructuring-2I-closing.rst
Follow the format of the 2G-2H summary llog (ax11_A11). Contents:
Title: “Phase 2I: BEST Names Architecture — Closing Summary”
Section title underlines:
=for title,-for sections,^for subsectionsGenerated-by line with date and model
Phase Overview: - What Phase 2I set out to accomplish - The 7 sub-phases and their purposes
Deliverable Audit: - The checklist from Step 1 with PASS/INCOMPLETE status - Count: X of Y deliverables complete
Key Design Decisions: Summarize the major architectural choices made in Phase 2I:
7-dimensional label grammar
PoE→PoC→PoR→PoT→PoU pipeline
DRY principle: compiled views, no
.. include::for labeled contentCollision-free proof for D6 sub-namespaces
45 PoR fields in 6 groups
Extraction matrix for audience-specific views
Source (
s*) vs. view (v*) distinction
Stress-Test Summary: - Total attacks, HELD/BREACH counts - Any critical findings and their resolutions - Overall assessment (from the stress-test report)
Known Limitations: List any unresolved issues, deferred decisions, or known gaps that Phase 3 must address.
Phase 3 Handoff:
What Phase 3 needs to do with the BEST Names architecture
Recommended execution order for Phase 3 work
Which prompts from Phase 2I should be re-run in Phase 3 (e.g., compilation after content updates)
StayVS Assessment: Rate the BEST Names architecture using the StayVS framework. Use the
dv_regime (Claude’s assessment). Include: - VVN (Versioned Variant Number) - StayC maturity code - Brief justificationCRITICAL: Per memory file
feedback_vvn_attribution.md, StayVS VVNs are personal assessments. NEVER attribute Claude’s assessment to LLoL. Usedv_prefix (Claude’s regime), NOTiv_(LLoL’s regime).
STEP 3 — UPDATE LLOG INDEX#
Add the closing llog to the toctree in: source/matheology/vv/jub/oov2/llog/index.rst
Under the “Phase 2I: Post-Processing” section, AFTER the earlier Phase 2I entries (testing report, stress-test).
STEP 4 — FINAL BUILD CHECK#
Run make html and confirm:
Zero new warnings from the closing llog
All Phase 2I files build correctly
No broken cross-references anywhere in the matheology section
The public naming pages are accessible from the site navigation
Report the final warning count (pre-existing vs. total).
STEP 5 — APPEND TO DEBUG FILE#
APPEND a session entry to ax10_A10 (debug file) with:
Verbatim prompt (this entire prompt, in a code-block)
Audit checklist results
List of all files created/modified
Build check result
Phase 2I is now CLOSED
CRITICAL RULES#
llog files are APPEND-ONLY.
NEVER delete content files.
NEVER abbreviate prompts in llogs.
The closing llog is a SUMMARY, not a rewrite. Reference the detailed documents; do not duplicate their content.
StayVS assessment uses
dv_regime (Claude’s assessment). NEVER useiv_(LLoL’s regime).LANGUAGE RULES: a. NEVER use bare “Jubilee” as standalone noun. b. NEVER use “the” for unproven superlatives.
TELES migration report (2026m04d04)
Mechanical identifier migration applied to this file. All axiom/theorem text references were migrated from short form (e.g., A15) to compound form (e.g., ax15_A15) as part of the matheology compound naming operation. Both forms refer to the same formal object. The old form survives as the suffix to ensure consistency with the oldest records; the new form adds a temporary-status prefix. Forward-facing pages use brief form (ax15) only. See TELES Axiom/Theorem Compound Naming — Execution Prompt for the complete mapping table and DD b12 — Legacy Naming for PET/JUB Axioms and Theorems for the permanent reference.
TELES repair — 2026m04d04
Repaired RST syntax errors (unexpected indentation, heading level inconsistencies, or list formatting). No formal content was modified.