.. Migration note (2026m04d04): Claude copied this file during VV-to-HELL migration.
   STATUS: DEPRECATED — kept next to successor for audit trail.
   Old path: ``vv/jub/oov2/prompts/deprecated/prompt_2I-7_unsplit.rst`` (as given by LLoL)
   New path: ``hell/ll/jub/b/37/deprecated_prompt_2I-7_unsplit.rst`` (as chosen by Claude)
   Category: Deprecated (pre-split)

.. meta::
   :description: Deprecated unsplit prompt for Phase 2I-7 project closing, superseded by the split sessions 2I-7a (audit) and 2I-7b (llog and Phase 3 handoff).
   :keywords: JUB OOv2, Phase 2I-7, deprecated, unsplit, closing, llog, handoff, Phase 3, superseded, audit, split sessions
   :author: Yah, Yas, everyone, LLoL as Laurence Loewe of Laodicea, ClaudeOp46Max, Anthropic, and Spirit of Boolean Truth
   :og:card:title: Phase 2I-7: Unsplit<br>Closing (Deprecated)
   :og:card:description: Closing was too complex for one session. Split into 2I-7a (deliverable audit) and 2I-7b (permanent llog and Phase 3 handoff).

.. SOCIAL-CARD-QUALITY-COMPARE --- OO (default effort) vs PP (max effort), 2026-03-26
   OO :description: Deprecated unsplit prompt for Phase 2I-7 closing, superseded by the split sessions 2I-7a and 2I-7b.
   OO :keywords: JUB OOv2, Phase 2I-7, deprecated, unsplit, closing, llog, handoff, Phase 3, matheology, superseded
   OO :og:card:title: Phase 2I-7: Unsplit<br>Closing (Deprecated)
   OO :og:card:description: Deprecated unsplit prompt for Phase 2I-7 closing, replaced by 2I-7a (audit) and 2I-7b (llog and handoff).
   PP :description: Deprecated unsplit prompt for Phase 2I-7 project closing, superseded by the split sessions 2I-7a (audit) and 2I-7b (llog and Phase 3 handoff).
   PP :keywords: JUB OOv2, Phase 2I-7, deprecated, unsplit, closing, llog, handoff, Phase 3, superseded, audit, split sessions
   PP :og:card:title: Phase 2I-7: Unsplit<br>Closing (Deprecated)
   PP :og:card:description: Closing was too complex for one session. Split into 2I-7a (deliverable audit) and 2I-7b (permanent llog and Phase 3 handoff).

.. SOCIAL-CARD-REVIEW --- generated by Claude Opus 4.6, 2026-03-26
   dv_ClaOp46_PP_2026m03d26 --- max-effort rewrite, read full page.
   :description: 142 chars | :og:card:title: 39 chars (excl <br>)
   - [ ] PP title more compelling than OO title
   - [ ] PP description more accurate than OO description
   - [ ] Description hooks without misleading
   - [ ] Keywords specific to this page's actual content
   - [ ] No language rule violations
   - [ ] Character counts verified

*********************************************************************
Phase 2I-7: Phase 2I Closing
*********************************************************************

.. note::

   **Path update needed if rerun (2026-03-25, Phase 2I-3).** This
   prompt was deprecated and superseded by 2I-7a/2I-7b. The AHA doc
   path below has moved to the compiler directory.

.. note::

   **200K-token execution prompt.** Copy-paste everything below the
   horizontal rule into a new Claude Code session.

   **Prerequisite:** All Phase 2I prompts (2I-1 through 2I-6) must
   have completed. This is the final prompt in the Phase 2I sequence.

----

/clear
/compact
/effort max

You are executing Phase 2I-7 of the JUB OOv2 matheology project:
**closing Phase 2I.** This session reviews all Phase 2I work,
writes the closing llog, updates the index, and prepares the
handoff to Phase 3.


====================================================================
STEP 0 --- READ ALL REQUIRED FILES (DO THIS FIRST)
====================================================================

  ax1_A1. AHA DESIGN DOC:
  source/matheology/vv/jub/oov2/llog/aha-best-names-for-matheology-links.rst
  (New location: source/matheology/compiler/ww/5d-link-naming-matheology-aha.rst)

  ax2_A2. PoR FIELD TESTING REPORT:
  source/matheology/vv/jub/oov2/llog/2I-por-field-testing.rst

  ax3_A3. SKILL SPECIFICATION:
  source/matheology/vv/jub/oov2/llog/skill-compile-matheology.rst

  ax4_A4. ADVERSARIAL STRESS-TEST REPORT:
  source/matheology/vv/jub/oov2/llog/2I-adversarial-stress-test.rst

  ax5_A5. COMPILED EXPERT VIEW:
  source/matheology/compiled/axioms/expert.rst
  (New location per DD-b12: source/matheology/axioms/expert/)

  ax6_A6. COMPILED EASY VIEW:
  source/matheology/compiled/axioms/easy.rst
  (New location per DD-b12: source/matheology/axioms/easy/)

  ax7_A7. PUBLIC DOCUMENTATION (all 4 depth pages):
  source/matheology/naming-easy.rst
  source/matheology/naming-producer.rst
  source/matheology/naming-expert.rst
  source/matheology/naming-architect.rst

  ax8_A8. ALL PHASE 2I PROMPTS:
  source/matheology/vv/jub/oov2/prompts/prompt_2I-1.rst
  source/matheology/vv/jub/oov2/prompts/prompt_2I-2.rst
  source/matheology/vv/jub/oov2/prompts/prompt_2I-3.rst
  source/matheology/vv/jub/oov2/prompts/prompt_2I-4.rst
  source/matheology/vv/jub/oov2/prompts/prompt_2I-5.rst
  source/matheology/vv/jub/oov2/prompts/prompt_2I-6.rst
  source/matheology/vv/jub/oov2/prompts/prompt_2I-7.rst

  ax9_A9. LLOG INDEX:
  source/matheology/vv/jub/oov2/llog/index.rst

  ax10_A10. DEBUG FILE:
  source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-phase1-prompts-reply-overviews-for-debugs.rst

  ax11_A11. 2G-2H SUMMARY (previous phase closing, for format reference):
  source/matheology/vv/jub/oov2/llog/llog_2026m03d22_restructuring-2G-2H-stress-tests-summary-freeze.rst


====================================================================
STEP 1 --- AUDIT ALL PHASE 2I DELIVERABLES
====================================================================

Check that every expected deliverable exists and is complete:

**From 2I-1 (Migration):**

- [ ] All labels migrated from flat (``ax1``) to model-prefixed
      (``pet-ax1``)
- [ ] All cross-references updated
- [ ] Migration comments in affected files
- [ ] Build passes with zero new warnings

**From 2I-2 (PoR Field Testing):**

- [ ] Coverage matrix exists (elements × 45 fields)
- [ ] Gap analysis complete
- [ ] Extraction difficulty assessment complete

**From 2I-3 (Compilation Skill):**

- [ ] Extraction matrix defined (45 fields × 5 depths)
- [ ] Skill specification written
- [ ] Stub templates created (5 audience depths)

**From 2I-4 (First Compilation):**

- [ ] Expert view exists at ``compiled/axioms/expert.rst``
      (New location per DD-b12: ``axioms/expert/``)
- [ ] Easy view exists at ``compiled/axioms/easy.rst``
      (New location per DD-b12: ``axioms/easy/``)
- [ ] Compiled index with toctree
- [ ] No duplicate labels

**From 2I-5 (Adversarial Stress-Test):**

- [ ] Attack report exists
- [ ] All BREACH items have proposed fixes
- [ ] Overall assessment rendered

**From 2I-6 (Public Documentation):**

- [ ] 4 audience-depth pages exist (easy, producer, expert,
      architect)
- [ ] Navigation index exists (``naming.rst``)
- [ ] Pages linked from matheology index

Record the audit result for each checklist item. If any item is
incomplete, note it in the closing llog as INCOMPLETE with
explanation.


====================================================================
STEP 2 --- WRITE THE PHASE 2I CLOSING LLOG
====================================================================

Create:
source/matheology/vv/jub/oov2/llog/llog_2026m03d23_restructuring-2I-closing.rst

Follow the format of the 2G-2H summary llog (ax11_A11). Contents:

1. Title: "Phase 2I: BEST Names Architecture --- Closing Summary"
2. Section title underlines: ``=`` for title, ``-`` for sections,
   ``^`` for subsections
3. Generated-by line with date and model

4. **Phase Overview:**
   - What Phase 2I set out to accomplish
   - The 7 sub-phases and their purposes

5. **Deliverable Audit:**
   - The checklist from Step 1 with PASS/INCOMPLETE status
   - Count: X of Y deliverables complete

6. **Key Design Decisions:**
   Summarize the major architectural choices made in Phase 2I:

   a. 7-dimensional label grammar
   b. PoE→PoC→PoR→PoT→PoU pipeline
   c. DRY principle: compiled views, no ``.. include::`` for
      labeled content
   d. Collision-free proof for D6 sub-namespaces
   e. 45 PoR fields in 6 groups
   f. Extraction matrix for audience-specific views
   g. Source (``s*``) vs. view (``v*``) distinction

7. **Stress-Test Summary:**
   - Total attacks, HELD/BREACH counts
   - Any critical findings and their resolutions
   - Overall assessment (from the stress-test report)

8. **Known Limitations:**
   List any unresolved issues, deferred decisions, or known gaps
   that Phase 3 must address.

9. **Phase 3 Handoff:**

   - What Phase 3 needs to do with the BEST Names architecture
   - Recommended execution order for Phase 3 work
   - Which prompts from Phase 2I should be re-run in Phase 3
     (e.g., compilation after content updates)

10. **StayVS Assessment:**
    Rate the BEST Names architecture using the StayVS framework.
    Use the ``dv_`` regime (Claude's assessment). Include:
    - VVN (Versioned Variant Number)
    - StayC maturity code
    - Brief justification

    **CRITICAL:** Per memory file ``feedback_vvn_attribution.md``,
    StayVS VVNs are personal assessments. NEVER attribute Claude's
    assessment to LLoL. Use ``dv_`` prefix (Claude's regime), NOT
    ``iv_`` (LLoL's regime).


====================================================================
STEP 3 --- UPDATE LLOG INDEX
====================================================================

Add the closing llog to the toctree in:
source/matheology/vv/jub/oov2/llog/index.rst

Under the "Phase 2I: Post-Processing" section, AFTER the earlier
Phase 2I entries (testing report, stress-test).


====================================================================
STEP 4 --- FINAL BUILD CHECK
====================================================================

Run ``make html`` and confirm:

1. Zero new warnings from the closing llog
2. All Phase 2I files build correctly
3. No broken cross-references anywhere in the matheology section
4. The public naming pages are accessible from the site navigation

Report the final warning count (pre-existing vs. total).


====================================================================
STEP 5 --- APPEND TO DEBUG FILE
====================================================================

APPEND a session entry to ax10_A10 (debug file) with:

1. Verbatim prompt (this entire prompt, in a code-block)
2. Audit checklist results
3. List of all files created/modified
4. Build check result
5. Phase 2I is now CLOSED


====================================================================
CRITICAL RULES
====================================================================

1. llog files are APPEND-ONLY.
2. NEVER delete content files.
3. NEVER abbreviate prompts in llogs.
4. The closing llog is a SUMMARY, not a rewrite. Reference the
   detailed documents; do not duplicate their content.
5. StayVS assessment uses ``dv_`` regime (Claude's assessment).
   NEVER use ``iv_`` (LLoL's regime).
6. LANGUAGE RULES:
   a. NEVER use bare "Jubilee" as standalone noun.
   b. NEVER use "the" for unproven superlatives.


.. admonition:: TELES migration report (2026m04d04)

   Mechanical identifier migration applied to this file.
   All axiom/theorem text references were migrated from short form
   (e.g., A15) to compound form (e.g., ax15_A15) as part of the
   matheology compound naming operation. Both forms refer to the
   same formal object. The old form survives as the suffix to
   ensure consistency with the oldest records; the new form adds
   a temporary-status prefix. Forward-facing pages use brief form
   (ax15) only. See
   :ref:`hell-ll-other-b15-teles-renaming-prompt` for the complete
   mapping table and :ref:`legacy-5d-link-names-table-for-pet-jub-model` for the permanent
   reference.


.. admonition:: TELES repair — 2026m04d04

   Repaired RST syntax errors (unexpected indentation, heading level inconsistencies,
   or list formatting). No formal content was modified.
