Phase 2I-7: Phase 2I Closing#

Note

Path update needed if rerun (2026-03-25, Phase 2I-3). This prompt was deprecated and superseded by 2I-7a/2I-7b. The AHA doc path below has moved to the compiler directory.

Note

200K-token execution prompt. Copy-paste everything below the horizontal rule into a new Claude Code session.

Prerequisite: All Phase 2I prompts (2I-1 through 2I-6) must have completed. This is the final prompt in the Phase 2I sequence.


/clear /compact /effort max

You are executing Phase 2I-7 of the JUB OOv2 matheology project: closing Phase 2I. This session reviews all Phase 2I work, writes the closing llog, updates the index, and prepares the handoff to Phase 3.

STEP 0 — READ ALL REQUIRED FILES (DO THIS FIRST)#

ax1_A1. AHA DESIGN DOC: source/matheology/vv/jub/oov2/llog/aha-best-names-for-matheology-links.rst (New location: source/matheology/compiler/ww/5d-link-naming-matheology-aha.rst)

ax2_A2. PoR FIELD TESTING REPORT: source/matheology/vv/jub/oov2/llog/2I-por-field-testing.rst

ax3_A3. SKILL SPECIFICATION: source/matheology/vv/jub/oov2/llog/skill-compile-matheology.rst

ax4_A4. ADVERSARIAL STRESS-TEST REPORT: source/matheology/vv/jub/oov2/llog/2I-adversarial-stress-test.rst

ax5_A5. COMPILED EXPERT VIEW: source/matheology/compiled/axioms/expert.rst (New location per DD-b12: source/matheology/axioms/expert/)

ax6_A6. COMPILED EASY VIEW: source/matheology/compiled/axioms/easy.rst (New location per DD-b12: source/matheology/axioms/easy/)

ax7_A7. PUBLIC DOCUMENTATION (all 4 depth pages): source/matheology/naming-easy.rst source/matheology/naming-producer.rst source/matheology/naming-expert.rst source/matheology/naming-architect.rst

ax8_A8. ALL PHASE 2I PROMPTS: source/matheology/vv/jub/oov2/prompts/prompt_2I-1.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-2.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-3.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-4.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-5.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-6.rst source/matheology/vv/jub/oov2/prompts/prompt_2I-7.rst

ax9_A9. LLOG INDEX: source/matheology/vv/jub/oov2/llog/index.rst

ax10_A10. DEBUG FILE: source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-phase1-prompts-reply-overviews-for-debugs.rst

ax11_A11. 2G-2H SUMMARY (previous phase closing, for format reference): source/matheology/vv/jub/oov2/llog/llog_2026m03d22_restructuring-2G-2H-stress-tests-summary-freeze.rst

STEP 1 — AUDIT ALL PHASE 2I DELIVERABLES#

Check that every expected deliverable exists and is complete:

From 2I-1 (Migration):

  • [ ] All labels migrated from flat (ax1) to model-prefixed

    (pet-ax1)

  • [ ] All cross-references updated

  • [ ] Migration comments in affected files

  • [ ] Build passes with zero new warnings

From 2I-2 (PoR Field Testing):

  • [ ] Coverage matrix exists (elements × 45 fields)

  • [ ] Gap analysis complete

  • [ ] Extraction difficulty assessment complete

From 2I-3 (Compilation Skill):

  • [ ] Extraction matrix defined (45 fields × 5 depths)

  • [ ] Skill specification written

  • [ ] Stub templates created (5 audience depths)

From 2I-4 (First Compilation):

  • [ ] Expert view exists at compiled/axioms/expert.rst

    (New location per DD-b12: axioms/expert/)

  • [ ] Easy view exists at compiled/axioms/easy.rst

    (New location per DD-b12: axioms/easy/)

  • [ ] Compiled index with toctree

  • [ ] No duplicate labels

From 2I-5 (Adversarial Stress-Test):

  • [ ] Attack report exists

  • [ ] All BREACH items have proposed fixes

  • [ ] Overall assessment rendered

From 2I-6 (Public Documentation):

  • [ ] 4 audience-depth pages exist (easy, producer, expert,

    architect)

  • [ ] Navigation index exists (naming.rst)

  • [ ] Pages linked from matheology index

Record the audit result for each checklist item. If any item is incomplete, note it in the closing llog as INCOMPLETE with explanation.

STEP 2 — WRITE THE PHASE 2I CLOSING LLOG#

Create: source/matheology/vv/jub/oov2/llog/llog_2026m03d23_restructuring-2I-closing.rst

Follow the format of the 2G-2H summary llog (ax11_A11). Contents:

  1. Title: “Phase 2I: BEST Names Architecture — Closing Summary”

  2. Section title underlines: = for title, - for sections, ^ for subsections

  3. Generated-by line with date and model

  4. Phase Overview: - What Phase 2I set out to accomplish - The 7 sub-phases and their purposes

  5. Deliverable Audit: - The checklist from Step 1 with PASS/INCOMPLETE status - Count: X of Y deliverables complete

  6. Key Design Decisions: Summarize the major architectural choices made in Phase 2I:

    1. 7-dimensional label grammar

    2. PoE→PoC→PoR→PoT→PoU pipeline

    3. DRY principle: compiled views, no .. include:: for labeled content

    4. Collision-free proof for D6 sub-namespaces

    5. 45 PoR fields in 6 groups

    6. Extraction matrix for audience-specific views

    7. Source (s*) vs. view (v*) distinction

  7. Stress-Test Summary: - Total attacks, HELD/BREACH counts - Any critical findings and their resolutions - Overall assessment (from the stress-test report)

  8. Known Limitations: List any unresolved issues, deferred decisions, or known gaps that Phase 3 must address.

  9. Phase 3 Handoff:

    • What Phase 3 needs to do with the BEST Names architecture

    • Recommended execution order for Phase 3 work

    • Which prompts from Phase 2I should be re-run in Phase 3 (e.g., compilation after content updates)

  10. StayVS Assessment: Rate the BEST Names architecture using the StayVS framework. Use the dv_ regime (Claude’s assessment). Include: - VVN (Versioned Variant Number) - StayC maturity code - Brief justification

    CRITICAL: Per memory file feedback_vvn_attribution.md, StayVS VVNs are personal assessments. NEVER attribute Claude’s assessment to LLoL. Use dv_ prefix (Claude’s regime), NOT iv_ (LLoL’s regime).

STEP 3 — UPDATE LLOG INDEX#

Add the closing llog to the toctree in: source/matheology/vv/jub/oov2/llog/index.rst

Under the “Phase 2I: Post-Processing” section, AFTER the earlier Phase 2I entries (testing report, stress-test).

STEP 4 — FINAL BUILD CHECK#

Run make html and confirm:

  1. Zero new warnings from the closing llog

  2. All Phase 2I files build correctly

  3. No broken cross-references anywhere in the matheology section

  4. The public naming pages are accessible from the site navigation

Report the final warning count (pre-existing vs. total).

STEP 5 — APPEND TO DEBUG FILE#

APPEND a session entry to ax10_A10 (debug file) with:

  1. Verbatim prompt (this entire prompt, in a code-block)

  2. Audit checklist results

  3. List of all files created/modified

  4. Build check result

  5. Phase 2I is now CLOSED

CRITICAL RULES#

  1. llog files are APPEND-ONLY.

  2. NEVER delete content files.

  3. NEVER abbreviate prompts in llogs.

  4. The closing llog is a SUMMARY, not a rewrite. Reference the detailed documents; do not duplicate their content.

  5. StayVS assessment uses dv_ regime (Claude’s assessment). NEVER use iv_ (LLoL’s regime).

  6. LANGUAGE RULES: a. NEVER use bare “Jubilee” as standalone noun. b. NEVER use “the” for unproven superlatives.

TELES migration report (2026m04d04)

Mechanical identifier migration applied to this file. All axiom/theorem text references were migrated from short form (e.g., A15) to compound form (e.g., ax15_A15) as part of the matheology compound naming operation. Both forms refer to the same formal object. The old form survives as the suffix to ensure consistency with the oldest records; the new form adds a temporary-status prefix. Forward-facing pages use brief form (ax15) only. See TELES Axiom/Theorem Compound Naming — Execution Prompt for the complete mapping table and DD b12 — Legacy Naming for PET/JUB Axioms and Theorems for the permanent reference.

TELES repair — 2026m04d04

Repaired RST syntax errors (unexpected indentation, heading level inconsistencies, or list formatting). No formal content was modified.