Phase 2H-1: OOv2 Freeze & Build Check#

Note

200K-token execution prompt. Copy-paste everything below the horizontal rule into a new Claude Code session. Phase 2H-2 (final documentation) runs separately after this completes.

Prerequisite: Phase 2G-4 must have completed.


/clear /compact /effort max

You are completing Phase 2 of the JUB OOv2 matheology restructuring project. This is Session 2H-1: freezing the OOv2 snapshot and consolidating all open items.

Phase 2G has produced the Final Phase 2 Summary, maturity assessment, and Phase 3 priorities in quest.rst. This session consolidates open items from all Phase 2 session llogs, performs final checking, and marks the OOv2 integration as complete.

STEP 0 — READ ALL REQUIRED FILES (DO THIS FIRST)#

ax1_A1. QUEST FILE (complete state after Phase 2G): source/matheology/jub/quest.rst

ax2_A2. MASTER PLAN (VVN syntax, freeze procedure): source/matheology/vv/jub/oov2/llog/llog_2026m03d20_restructuring-1-master-plan-and-methodology.rst

ax3_A3–ax8_A8. ALL PHASE 2 SESSION LLOGS (for Open Items consolidation): source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2a-critique1-c1-c3.rst source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2b-critique1-c4-c7.rst source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2c-critique1-c8-c14.rst source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2d-critique2-c2-1-c2-6.rst source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2e-critique2-c2-7-c2-12.rst source/matheology/vv/jub/oov2/llog/llog_2026m03d22_restructuring-2F-critique3-c3-1-c3-7.rst

ax9_A9. LLOG INDEX (to check toctree completeness): source/matheology/vv/jub/oov2/llog/index.rst

ax10_A10. CANONICAL FILES (for final consistency check): source/matheology/jub/axioms.rst source/matheology/jub/theorems.rst

STEP 1 — CONSOLIDATE OPEN ITEMS#

Read the “Open Items” or “Open items for Phase 3” sections from each of the 6 Phase 2 session llogs (2a–2F). Produce a consolidated list:

  • Remove duplicates

  • Group by theme (mathematical formalization, institutional design, empirical testing, etc.)

  • Cross-reference with the Phase 3 Priorities already in quest.rst (written by 2G-4)

  • Flag any open items NOT covered by the Phase 3 Priorities

If there are gaps, APPEND missing items to the Phase 3 Priorities section in quest.rst.

STEP 2 — FREEZE OOv2 SNAPSHOT#

  1. Update the .. note:: status in quest.rst (both Cons and Pros sections) to: “Phase 2 complete. All 33 objections integrated across sessions 2a–2H. OOv2 frozen on [today’s date].”

  2. Add a VVN annotation to quest.rst per the master plan’s VVN syntax. Apply the appropriate version tag (e.g., QQ_LLoL_v3r0p0_[today's date] or as the version history warrants).

  3. Check the toctree in source/matheology/vv/jub/oov2/llog/index.rst includes ALL Phase 2 session llogs in order (2a through 2F, plus whatever 2G/2H llogs have been added).

STEP 3 — FINAL CONSISTENCY CHECK#

Quick-scan axioms.rst and theorems.rst: - All cross-reference labels resolve (no duplicates, no orphans) - Annotations from Phases 2a–2F are coherent (no contradictions) - No annotation references a quest entry that does not exist

Report findings.

STEP 4 — BUILD CHECK#

Run: make html

Fix any NEW warnings or errors. Leave pre-existing warnings alone.

CRITICAL RULES#

  1. llog files are APPEND-ONLY.

  2. NEVER delete content files.

  3. Do NOT modify existing Con/Pro entries, ScoreBoard, or Round Summaries. Only modify status notes, VVN tags, and Phase 3 Priorities (if gaps found).

  4. LANGUAGE RULES: a. NEVER use bare “Jubilee” as standalone noun. b. NEVER use “the” for unproven superlatives.

TELES migration report (2026m04d04)

Mechanical identifier migration applied to this file. All axiom/theorem text references were migrated from short form (e.g., A15) to compound form (e.g., ax15_A15) as part of the matheology compound naming operation. Both forms refer to the same formal object. The old form survives as the suffix to ensure consistency with the oldest records; the new form adds a temporary-status prefix. Forward-facing pages use brief form (ax15) only. See TELES Axiom/Theorem Compound Naming — Execution Prompt for the complete mapping table and DD b12 — Legacy Naming for PET/JUB Axioms and Theorems for the permanent reference.