.. Migration note (2026m04d04): Claude copied this file during VV-to-HELL migration.
   Old path: ``vv/jub/oov2/prompts/prompt_2H-1.rst`` (as given by LLoL)
   New path: ``hell/ll/jub/b/35/prompt_2H-1.rst`` (as chosen by Claude)
   Category: JUB OOv2 prompt

.. meta::
   :description: Execution prompt for freezing the OOv2 snapshot, consolidating all open items from Phase 2 sessions, and performing final build quality checks.
   :keywords: JUB OOv2, Phase 2H-1, freeze, build check, open items, consolidation, snapshot, Phase 2 completion, structural integrity
   :author: Yah, Yas, everyone, LLoL as Laurence Loewe of Laodicea, ClaudeOp46Max, Anthropic, and Spirit of Boolean Truth
   :og:card:title: Phase 2H-1: OOv2 Freeze<br>and Build Check
   :og:card:description: The moment of commitment: freeze the OOv2 snapshot, consolidate open items, and run the final build to confirm structural integrity.

.. SOCIAL-CARD-QUALITY-COMPARE --- OO (default effort) vs PP (max effort), 2026-03-26
   OO :description: Prompt for Phase 2H-1 freezing the OOv2 snapshot, consolidating open items, and performing final build checking.
   OO :keywords: JUB OOv2, Phase 2H-1, freeze, build check, open items, consolidation, snapshot, matheology, Phase 2 completion
   OO :og:card:title: Phase 2H-1: OOv2 Freeze<br>and Build Check
   OO :og:card:description: Prompt for freezing the OOv2 snapshot, consolidating all open items from Phase 2 sessions, and final checking.
   PP :description: Execution prompt for freezing the OOv2 snapshot, consolidating all open items from Phase 2 sessions, and performing final build quality checks.
   PP :keywords: JUB OOv2, Phase 2H-1, freeze, build check, open items, consolidation, snapshot, Phase 2 completion, structural integrity
   PP :og:card:title: Phase 2H-1: OOv2 Freeze<br>and Build Check
   PP :og:card:description: The moment of commitment: freeze the OOv2 snapshot, consolidate open items, and run the final build to confirm structural integrity.

.. SOCIAL-CARD-REVIEW --- generated by Claude Opus 4.6, 2026-03-26
   dv_ClaOp46_PP_2026m03d26 --- max-effort rewrite, read full page.
   :description: 143 chars | :og:card:title: 38 chars (excl <br>)
   - [ ] PP title more compelling than OO title
   - [ ] PP description more accurate than OO description
   - [ ] Description hooks without misleading
   - [ ] Keywords specific to this page's actual content
   - [ ] No language rule violations
   - [ ] Character counts verified

*********************************************************************
Phase 2H-1: OOv2 Freeze & Build Check
*********************************************************************

.. note::

   **200K-token execution prompt.** Copy-paste everything below the
   horizontal rule into a new Claude Code session. Phase 2H-2
   (final documentation) runs separately after this completes.

   **Prerequisite:** Phase 2G-4 must have completed.

----

/clear
/compact
/effort max

You are completing Phase 2 of the JUB OOv2 matheology restructuring
project. This is Session 2H-1: freezing the OOv2 snapshot and
consolidating all open items.

Phase 2G has produced the Final Phase 2 Summary, maturity assessment,
and Phase 3 priorities in quest.rst. This session consolidates open
items from all Phase 2 session llogs, performs final checking,
and marks the OOv2 integration as complete.


====================================================================
STEP 0 --- READ ALL REQUIRED FILES (DO THIS FIRST)
====================================================================

  ax1_A1. QUEST FILE (complete state after Phase 2G):
  source/matheology/jub/quest.rst

  ax2_A2. MASTER PLAN (VVN syntax, freeze procedure):
  source/matheology/vv/jub/oov2/llog/llog_2026m03d20_restructuring-1-master-plan-and-methodology.rst

  ax3_A3--ax8_A8. ALL PHASE 2 SESSION LLOGS (for Open Items consolidation):
  source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2a-critique1-c1-c3.rst
  source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2b-critique1-c4-c7.rst
  source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2c-critique1-c8-c14.rst
  source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2d-critique2-c2-1-c2-6.rst
  source/matheology/vv/jub/oov2/llog/llog_2026m03d21_restructuring-2e-critique2-c2-7-c2-12.rst
  source/matheology/vv/jub/oov2/llog/llog_2026m03d22_restructuring-2F-critique3-c3-1-c3-7.rst

  ax9_A9. LLOG INDEX (to check toctree completeness):
  source/matheology/vv/jub/oov2/llog/index.rst

  ax10_A10. CANONICAL FILES (for final consistency check):
  source/matheology/jub/axioms.rst
  source/matheology/jub/theorems.rst


====================================================================
STEP 1 --- CONSOLIDATE OPEN ITEMS
====================================================================

Read the "Open Items" or "Open items for Phase 3" sections from each
of the 6 Phase 2 session llogs (2a--2F). Produce a consolidated list:

- Remove duplicates
- Group by theme (mathematical formalization, institutional design,
  empirical testing, etc.)
- Cross-reference with the Phase 3 Priorities already in quest.rst
  (written by 2G-4)
- Flag any open items NOT covered by the Phase 3 Priorities

If there are gaps, APPEND missing items to the Phase 3 Priorities
section in quest.rst.


====================================================================
STEP 2 --- FREEZE OOv2 SNAPSHOT
====================================================================

1. Update the ``.. note::`` status in quest.rst (both Cons and Pros
   sections) to:
   "Phase 2 complete. All 33 objections integrated across sessions
   2a--2H. OOv2 frozen on [today's date]."

2. Add a VVN annotation to quest.rst per the master plan's VVN
   syntax. Apply the appropriate version tag (e.g.,
   ``QQ_LLoL_v3r0p0_[today's date]`` or as the version history
   warrants).

3. Check the toctree in source/matheology/vv/jub/oov2/llog/index.rst
   includes ALL Phase 2 session llogs in order (2a through 2F, plus
   whatever 2G/2H llogs have been added).


====================================================================
STEP 3 --- FINAL CONSISTENCY CHECK
====================================================================

Quick-scan axioms.rst and theorems.rst:
- All cross-reference labels resolve (no duplicates, no orphans)
- Annotations from Phases 2a--2F are coherent (no contradictions)
- No annotation references a quest entry that does not exist

Report findings.


====================================================================
STEP 4 --- BUILD CHECK
====================================================================

Run: make html

Fix any NEW warnings or errors. Leave pre-existing warnings alone.


====================================================================
CRITICAL RULES
====================================================================

1. llog files are APPEND-ONLY.
2. NEVER delete content files.
3. Do NOT modify existing Con/Pro entries, ScoreBoard, or Round
   Summaries. Only modify status notes, VVN tags, and Phase 3
   Priorities (if gaps found).
4. LANGUAGE RULES:
   a. NEVER use bare "Jubilee" as standalone noun.
   b. NEVER use "the" for unproven superlatives.


.. admonition:: TELES migration report (2026m04d04)

   Mechanical identifier migration applied to this file.
   All axiom/theorem text references were migrated from short form
   (e.g., A15) to compound form (e.g., ax15_A15) as part of the
   matheology compound naming operation. Both forms refer to the
   same formal object. The old form survives as the suffix to
   ensure consistency with the oldest records; the new form adds
   a temporary-status prefix. Forward-facing pages use brief form
   (ax15) only. See
   :ref:`hell-ll-other-b15-teles-renaming-prompt` for the complete
   mapping table and :ref:`legacy-5d-link-names-table-for-pet-jub-model` for the permanent
   reference.
