.. Migration note (2026m04d04): Claude copied this file during VV-to-HELL migration.
   Old path: ``vv/jub/oov2/prompts/prompt_2I-2b.rst`` (as given by LLoL)
   New path: ``hell/ll/jub/b/47/prompt_2I-2b.rst`` (as chosen by Claude)
   Category: JUB OOv2 prompt

.. meta::
   :description: Execution prompt for testing PoR fields 19 through 45 covering operational, network, and analytical categories using stress-test critique evidence.
   :keywords: JUB OOv2, Phase 2I-2b, PoR fields, field testing, operational, network, analytical, stress-test evidence, coverage report
   :author: Yah, Yas, everyone, LLoL as Laurence Loewe of Laodicea, ClaudeOp46Max, Anthropic, and Spirit of Boolean Truth
   :og:card:title: Phase 2I-2b: PoR Field<br>Testing (Fields 19-45)
   :og:card:description: Completing the coverage report with stress-test and critique evidence for the remaining 27 PoR fields in operational and analytical categories.

.. SOCIAL-CARD-QUALITY-COMPARE --- OO (default effort) vs PP (max effort), 2026-03-26
   OO :description: Prompt for Phase 2I-2b testing PoR fields 19 through 45 covering operational, network, and analytical categories.
   OO :keywords: JUB OOv2, Phase 2I-2b, PoR fields, field testing, operational, network, analytical, stress-test, matheology, coverage
   OO :og:card:title: Phase 2I-2b: PoR Field<br>Testing (Fields 19-45)
   OO :og:card:description: Prompt for testing PoR fields 19 through 45 using stress-test and critique evidence to complete the coverage report.
   PP :description: Execution prompt for testing PoR fields 19 through 45 covering operational, network, and analytical categories using stress-test critique evidence.
   PP :keywords: JUB OOv2, Phase 2I-2b, PoR fields, field testing, operational, network, analytical, stress-test evidence, coverage report
   PP :og:card:title: Phase 2I-2b: PoR Field<br>Testing (Fields 19-45)
   PP :og:card:description: Completing the coverage report with stress-test and critique evidence for the remaining 27 PoR fields in operational and analytical categories.

.. SOCIAL-CARD-REVIEW --- generated by Claude Opus 4.6, 2026-03-26
   dv_ClaOp46_PP_2026m03d26 --- max-effort rewrite, read full page.
   :description: 147 chars | :og:card:title: 44 chars (excl <br>)
   - [ ] PP title more compelling than OO title
   - [ ] PP description more accurate than OO description
   - [ ] Description hooks without misleading
   - [ ] Keywords specific to this page's actual content
   - [ ] No language rule violations
   - [ ] Character counts verified

*********************************************************************
Phase 2I-2b: PoR Field Testing --- Operational, Network, Analytical
*********************************************************************

.. note::

   **Path update needed if rerun (2026-03-25, Phase 2I-3).** This
   prompt was executed before the compiler directory was created. If
   this script is ever rerun, update the AHA doc path below.

.. note::

   **200K-token execution prompt.** Copy-paste everything below the
   horizontal rule into a new Claude Code session.

   **Prerequisite:** Phase 2I-2a must have completed and written its
   partial report to
   ``source/matheology/vv/jub/oov2/llog/2I-por-field-testing-part-a.rst``

   **Token budget:** ~100K. Reads the stress-test and critique
   files (which contain the operational/analytical evidence) plus
   the Part A report. Does NOT re-read the full PoR source files.

----

/clear
/compact
/effort max

You are executing Phase 2I-2b of the JUB OOv2 matheology project:
**PoR field testing, Part B.** This session tests fields
19--45 (Operational State, Network & Versioning, Analytical)
against the stress-test output, critique integration, and quest
structure.

This session does NO migration or code changes. It reads, analyses,
and produces the COMBINED final testing report.


====================================================================
STEP 0 --- READ ALL REQUIRED FILES (DO THIS FIRST)
====================================================================

  ax1_A1. AHA DESIGN DOC (field definitions, Section 11) --- READ IN FULL:
  source/matheology/vv/jub/oov2/llog/aha-best-names-for-matheology-links.rst
  (New location: source/matheology/compiler/ww/5d-link-naming-matheology-aha.rst)

  ax2_A2. PART A REPORT (fields 1--18 already tested) --- READ IN FULL:
  source/matheology/vv/jub/oov2/llog/2I-por-field-testing-part-a.rst

  ax3_A3. STRESS-TEST MATH --- READ IN FULL:
  source/matheology/vv/jub/oov2/llog/2G-stress-test-math.rst

  ax4_A4. STRESS-TEST FEASIBILITY --- READ IN FULL:
  source/matheology/vv/jub/oov2/llog/2G-stress-test-feasibility.rst

  ax5_A5. STRESS-TEST DISPOSITIONS --- READ IN FULL:
  source/matheology/vv/jub/oov2/llog/2G-stress-test-dispositions.rst

  ax6_A6. CRITIQUE INTEGRATION (C3.1--C3.7) --- READ IN FULL:
  source/matheology/vv/jub/oov2/llog/llog_2026m03d22_restructuring-2F-critique3-c3-1-c3-7.rst

  ax7_A7. JUB QUEST (for con/pro references and network) --- SELECTIVE:
  source/matheology/jub/quest.rst
  Use grep to find all ``.. _con-`` and ``.. _pro-`` labels and
  any ``:ref:`` cross-references between elements. Read 5-line
  context around each. Do NOT read the full file (~48K tokens).

  ax8_A8. 2G-2H SUMMARY (for StayVS assessments) --- READ IN FULL:
  source/matheology/vv/jub/oov2/llog/llog_2026m03d22_restructuring-2G-2H-stress-tests-summary-freeze.rst


====================================================================
STEP 1 --- BUILD COVERAGE MATRIX: FIELDS 19--45
====================================================================

For EACH axiom (ax1_A1--ax25_A25) and EACH theorem (th5_T5--th11_T11), assess
coverage for fields 19--45:

**Group 4: Operational State (fields 19--29)**

19. ``limit`` --- known limitations, assumptions
20. ``jj`` --- current blocker for this element
21. ``aa`` --- next steps, tasks
22. ``kk`` --- identified trap and avoidance
23. ``ff`` --- collected feedback to process
24. ``cc`` --- background reading from others
25. ``dd`` --- architectural decision for this element
26. ``gg`` --- promising draft not yet integrated
27. ``hh`` --- recently deprecated content
28. ``ww`` --- what would break if this changed
29. ``yy`` --- test case for reliability checking

**Group 5: Network & Versioning (fields 30--40)**

30. ``netout`` --- upstream dependencies (builds on)
31. ``netin`` --- downstream dependents (used by)
32. ``stayc`` --- StayVS maturity code
33. ``mento`` --- stage-appropriate learning guidance
34. ``diff`` --- what changed from prior versions
35. ``ll`` --- links to relevant llog sessions
36. ``con`` --- objection addressing this element
37. ``pro`` --- response defending this element
38. ``vv`` --- all VVNs for this element
39. ``vvnow`` --- pointer to latest version
40. ``model`` --- which model(s) use this element

**Group 6: Analytical (fields 41--45)**

41. ``conv`` --- where traditions agree/diverge
42. ``bib`` --- academic references
43. ``pol`` --- known active policy discussions
44. ``his`` --- historical analysis
45. ``doi`` --- permanent stable identifier

Use the same scoring: F/P/S/N.


====================================================================
STEP 2 --- NETWORK GRAPH EXTRACTION
====================================================================

For fields 30--31 (netout/netin), build the actual dependency
graph by reading the PoR content and stress-test analysis:

1. For each axiom, list which other axioms it depends on (netout)
   and which theorems/axioms depend on it (netin).
2. Every edge must be justified with a specific reason (e.g.,
   "th1_T1 depends on ax5_A5 because the proof invokes ax5_A5's containment
   property").
3. List any edges that are uncertain or disputed.
4. Note any missing edges (elements that appear isolated but
   probably should not be).


====================================================================
STEP 3 --- COMBINED GAP ANALYSIS
====================================================================

Merge the Part A findings with your Part B findings:

1. **Critical gaps:** Fields rated "Stub" for >50% of elements
   (across all 45 fields)
2. **Quick wins:** Fields rated "Partial" that could become "Full"
   with targeted work
3. **Source-text gaps by tradition** (from Part A)
4. **Network completeness** (from Step 2)
5. **StayVS coverage:** Do the 2G-2H assessments cover all 36
   elements?
6. **Operational field patterns:** Are the POST fields (jj, aa,
   kk, etc.) populated from the stress-test outputs, or are they
   systemically empty?


====================================================================
STEP 4 --- EXTRACTION DIFFICULTY (ALL 45 FIELDS)
====================================================================

Combine Part A's difficulty ratings (fields 1--18) with your
ratings for fields 19--45. Present the full 45-row table:
field, difficulty, source files, notes.


====================================================================
STEP 5 --- WRITE COMBINED FINAL REPORT
====================================================================

Create the FINAL combined report at:
source/matheology/vv/jub/oov2/llog/2I-por-field-testing.rst

Contents:

1. Title: "Phase 2I-2: PoR Field Testing Report"
2. Generated-by line (note: produced in two sessions, 2I-2a + 2I-2b)
3. **Complete coverage matrix** (all 36 elements × all 45 fields)
   --- merge Part A's fields 1--18 with your fields 19--45
4. Gap analysis (6 sections from Step 3)
5. Network dependency graph (from Step 2)
6. Complete extraction difficulty table (all 45 fields)
7. Recommendations for Phase 3 priority ordering
8. Any proposed changes to the 45-field structure

Then REMOVE the partial Part A file:
Rename ``2I-por-field-testing-part-a.rst`` to
``deprecated/2I-por-field-testing-part-a.rst`` (do not delete).


====================================================================
STEP 6 --- UPDATE LLOG INDEX
====================================================================

Add the final report to the toctree in:
source/matheology/vv/jub/oov2/llog/index.rst

Under the "Phase 2I: Post-Processing" section.


====================================================================
CRITICAL RULES
====================================================================

1. llog files are APPEND-ONLY.
2. NEVER delete content files. Move to deprecated/ instead.
3. This session READS and ANALYSES only. The files you CREATE are
   the final report (and deprecated move of Part A).
4. The combined report must be ONE file containing the complete
   matrix. Do not leave it split across two files.
5. NEVER abbreviate prompts in llogs.
6. LANGUAGE RULES:
   a. NEVER use bare "Jubilee" as standalone noun.
   b. NEVER use "the" for unproven superlatives.


.. admonition:: TELES migration report (2026m04d04)

   Mechanical identifier migration applied to this file.
   All axiom/theorem text references were migrated from short form
   (e.g., A15) to compound form (e.g., ax15_A15) as part of the
   matheology compound naming operation. Both forms refer to the
   same formal object. The old form survives as the suffix to
   ensure consistency with the oldest records; the new form adds
   a temporary-status prefix. Forward-facing pages use brief form
   (ax15) only. See
   :ref:`hell-ll-other-b15-teles-renaming-prompt` for the complete
   mapping table and :ref:`legacy-5d-link-names-table-for-pet-jub-model` for the permanent
   reference.
