.. Migration note (2026m04d04): Claude copied this file during VV-to-HELL migration.
   Old path: ``vv/jub/oov2/llog/llog_2026m03d21_restructuring-1-plan-additions-to-master-plan.rst`` (as given by LLoL)
   New path: ``hell/ll/jub/b/26/jub_ll_2026m03d21_restructuring-1-plan-additions.rst`` (as chosen by Claude)
   Category: JUB OOv2 log

.. meta::
   :description: Additions and decisions appended to the OOv2 master plan during restructuring: required-files lists, scope changes, and methodology refinements.
   :keywords: master plan additions, JUB OOv2, restructuring decisions, required files, scope changes, methodology, Claude Opus, session log, llog
   :author: Yah, Yas, everyone, LLoL as Laurence Loewe of Laodicea, ClaudeOp46Max, Anthropic, and Spirit of Boolean Truth
   :og:card:title: Master Plan Additions<br>OOv2 Restructuring Decisions
   :og:card:description: Every addition and scope decision appended to the JUB OOv2 master plan across the full restructuring process, collected in one audit trail.

.. SOCIAL-CARD-QUALITY-COMPARE --- OO (default effort) vs PP (max effort), 2026-03-26
   OO :description: Session log: Additions and decisions appended to the OOv2 master plan. Part of the JUB OOv2 restructuring process.
   OO :keywords: matheology, JUB, OOv2, master plan, additions, decisions, required files, restructuring, session log, llog
   OO :og:card:title: OOv2 Master Plan Additions Log
   OO :og:card:description: All additions, decisions, and required-files lists appended to the JUB OOv2 master plan across multiple restructuring sessions.
   PP :description: Additions and decisions appended to the OOv2 master plan during restructuring: required-files lists, scope changes, and methodology refinements.
   PP :keywords: master plan additions, JUB OOv2, restructuring decisions, required files, scope changes, methodology, Claude Opus, session log, llog
   PP :og:card:title: Master Plan Additions<br>OOv2 Restructuring Decisions
   PP :og:card:description: Every addition and scope decision appended to the JUB OOv2 master plan across the full restructuring process, collected in one audit trail.

.. SOCIAL-CARD-REVIEW --- generated by Claude Opus 4.6, 2026-03-26
   dv_ClaOp46_PP_2026m03d26 --- max-effort rewrite, read full page.
   :description: 146 chars | :og:card:title: 44 chars (excl <br>)
   - [ ] PP title more compelling than OO title
   - [ ] PP description more accurate than OO description
   - [ ] Description hooks without misleading
   - [ ] Keywords specific to this page's actual content
   - [ ] No language rule violations
   - [ ] Character counts verified

.. note:: **Editorial note (2026-03-24).**
   This log uses "validated," "verified," and similar terms in places
   where the author's long-standing practice is to say "tested" or
   "checked." The distinction matters: open systems cannot be confirmed
   correct by any finite set of checks --- they can only be tested
   (see :ref:`not-tested-not-validated` in the adversarial stress-test
   report for the full argument). The AI-generated text was not
   corrected at the time of writing. The log is otherwise unaltered.

****************************************************************************************************
Plan Additions to Master Plan
****************************************************************************************************

This file collects all additions and decisions made to the
:doc:`master plan </matheology/hell/ll/jub/b/25/jub_ll_2026m03d20_restructuring-1-master-plan>`
across sessions. **Claude reads this file alongside the master plan at the
start of each session.**

For the verbatim prompts that led to these additions, see the
:doc:`debug log </matheology/hell/ll/jub/b/33/jub_ll_2026m03d21_phase1-prompts-reply-overviews>`.


.. contents:: On this page
   :depth: 2
   :local:


----


.. _very-important-files:

VERY IMPORTANT Files to Read at Session Start
================================================

The following files must be read at the start of each Phase 2 session
(in addition to this file):

.. list-table::
   :header-rows: 1
   :widths: 50 50

   * - File
     - Purpose
   * - :doc:`/matheology/hell/ll/jub/b/25/jub_ll_2026m03d20_restructuring-1-master-plan`
     - Master plan: methodology, severity scale (A--H), quest template,
       maturity lifecycle (MM--SS), Spheres (Se1--Se7), phase sequence,
       naming conventions
   * - :doc:`/matheology/hell/ll/jub/b/49/jub_ll_2026m03d20_quest-cons-table`
     - Master inventory of all 33 OOv1 objections with severity, targets,
       Spheres, session assignments, reply dispositions, and summary
       statistics
   * - :doc:`/matheology/jub/quest`
     - The quest file being populated with Con/Pro entries during Phase 2
   * - ``source/matheology/jub/axioms.rst``
     - Canonical JUB axioms ax15_A15--ax25_A25 (may be modified during Phase 2)
   * - ``source/matheology/jub/theorems.rst``
     - Canonical JUB theorems th5_T5--th11_T11 (may be modified during Phase 2)
   * - ``source/matheology/jub/symbols.rst``
     - JUB symbol dictionary (may be extended during Phase 2)

**Not needed for routine sessions** (debugging only):

- :doc:`/matheology/hell/ll/jub/b/33/jub_ll_2026m03d21_phase1-prompts-reply-overviews`
- :doc:`/matheology/hell/ll/jub/b/32/jub_ll_2026m03d21_restructuring-phase1-consolidate`


----


.. _decisions-log:

Decisions Log
===============

Decisions are appended here as they arise. Each entry links to the debug
session that produced it.


.. _additions-session-1:

Session 1 Decisions (2026-03-20): Master Plan Creation
--------------------------------------------------------

*Debug log:* :ref:`debug-session-1`

1. **Scholastic disputatio method adopted** with modern naming (Quest/Cons/Pros).
   Source: Aquinas, Chenu, Bazian, Rescher, Kahneman.

2. **8-level severity scale (A--H)** adopted, matching OOv1 granularity.
   Intermediate levels (B, D, F) encode genuine uncertainty; forced binary
   choice is BABL-algorithm stereotyping.

3. **7 Spheres of evidence (Se1--Se7)** adopted. "Spheres" chosen over
   "Zones" (conflict with ZION) and "Disciplines" (doesn't fit "Long-Shot").

4. **Maturity lifecycle (MM--SS)** mapped to StayC codes with VVN annotation
   syntax for QQ/NN cycles.

5. **Phase sequence:** Phase 1 (consolidate) -> Phase 2 (integrate 33
   critiques, 8 sessions) -> Phase 3 (new axioms) -> Phase 4 (audience) ->
   Phase 5 (PDF).

6. **Naming convention:** ``ax``/``th`` (provisional) -> ``Ax``/``Th``
   (permanent) after Phase 3 stabilization.

7. **File structure split:** ax1_A1--ax14_A14 canonical in ``pet/``, ax15_A15--ax25_A25 in
   ``jub/``, comprehensive ``axioms/index.rst`` via ``.. include::``.


.. _additions-session-2:

Session 2 Decisions (2026-03-21): Phase 1 Consolidation
---------------------------------------------------------

*Debug log:* :ref:`debug-session-2`

1. **Canonical split executed:** ax1_A1--ax14_A14/th1_T1--th4_T4 in ``pet/``, ax15_A15--ax25_A25/th5_T5--th11_T11
   in ``jub/``. JUB symbol dictionary created (11 entities, 18 predicates).

2. **Comprehensive listing pages** use ``.. include::`` with content markers
   (``:start-after:``/``:end-before:``).

3. **Absolute :doc: references** required in any content that may be included
   from a different directory.

4. **Renaming deferred to Phase 2a.** Adding ``.. _ax1:`` labels happens when
   each axiom is already being touched for quest cross-references. Double work
   to add now.

5. **llog rules (CRITICAL)** added to CLAUDE.md: append-only, never delete.


.. _additions-session-3:

Session 3 Decisions (2026-03-21): Phase 1b Readiness
-------------------------------------------------------

*Debug log:* :ref:`debug-session-3`

1. **Theodicy cross-referenced:** 22-row table added to ``theodicy.rst``
   mapping every inline axiom/theorem mention to its canonical source. 9
   items marked ``[N]`` for narrative elaborations beyond the formal statement.
   Theodicy will be rewritten after Phase 3/4; until then, canonical sources
   are authoritative.

2. **Critique inventory table created:** ``quest-cons-table.rst`` with all 33
   objections mapped to severity (A--H), target axioms/theorems, Spheres
   (Se1--Se7), Phase 2 sessions, reply dispositions, and summary statistics.

3. **Session 2f flagged as empty:** All 7 Round 3 objections are feasibility
   (Se2--Se6), not mathematical necessity (Se1). **Recommendation: merge 2f
   into 2g.** Awaiting LLoL's decision.

4. **Master plan split into 3 files:**

   - (a) Master plan (working reference, methodology, phase sequence)
   - (b) This additions file (decisions, important-files list)
   - (c) Debug log (verbatim prompts, response overviews)

5. **``quest-cons-table.rst``** linked from: quest.rst, jub/index.rst,
   master plan Phase 2 section, oov2/llog/index.rst.


----


.. _additions-session-4:

Session 4 Decisions (2026-03-21): Phase 2a — C1–C3 Integration
-----------------------------------------------------------------

*Debug log:* :ref:`debug-session-4`

1. **Pro-D.2 impact set to D (Substantial), not A:** The reply to C2
   conceded the post-hoc framing problem. Per the steel-man and honesty
   principles, the impact grade reflects the partial concession. The
   theoretical argument (CTMC model) carries th8_T8's defense; the empirical
   framing was reclassified as illustrative.

2. **No axiom/theorem formal statements revised.** The C1–C3 critique
   and reply exchange did not force changes to any formal statements
   (ax19_A19, th6_T6, th7_T7, th8_T8, th9_T9, th11_T11). An illustrative note was added to th8_T8's
   empirical verification table.

3. **Cross-reference labels added** to axioms/theorems touched by C1–C3:
   ``_ax19``, ``_th6``, ``_th7``, ``_th8``, ``_th9``, ``_th11``. Per
   the Session 2 deferred decision (item 4).

4. **Quest entry cross-reference labels added:** ``_con-a-1``,
   ``_con-a-2``, ``_con-c-3``, ``_pro-a-1``, ``_pro-d-2``, ``_pro-c-3``
   for future cross-referencing from axiom/theorem files.


----


.. _additions-session-5:

Session 5 Decisions (2026-03-21): Phase 2b — C4–C7 Integration
-----------------------------------------------------------------

*Debug log:* :ref:`debug-session-5`

1. **th9_T9 note added (judgment call).** A ``.. note::`` was added to th9_T9 in
   ``theorems.rst`` documenting the finite mixing-time model from Pro-C.5.
   The 7TrackRole Markov chain model replaces the eschatological-time step
   with a finite mixing-time bound. This is analogous to the illustrative
   note added to th8_T8 in Phase 2a — it informs the reader of a more rigorous
   basis without changing the formal statement.

2. **No axiom/theorem formal statements revised.** The C4–C7 critique
   and reply exchange did not force changes to any formal statements
   (ax25_A25, th8_T8, th9_T9). ax25_A25's periodicity claim is supported (not changed) by
   Pro-E.4's efficiency argument. th9_T9's formal statement stands; only
   the note was added. th8_T8 was not further annotated beyond Phase 2a.

3. **Cross-reference labels added** to axioms/theorems touched by C4–C7:
   ``_ax25`` in axioms.rst, ``_th5`` in theorems.rst. Per the Session 2
   deferred decision (item 4).

4. **Pro-E.4 and Pro-E.6 graded at Impact E** to honestly reflect
   partial resolutions. The prompt's specifications were followed:
   ax25_A25 specificity (C4) and Piketty empirical base (C6) have genuine
   remaining gaps. Grade inflation was avoided per Critical Rule 7.

5. **Phase 2a entries preserved.** All existing Con-A.1, Con-A.2,
   Con-C.3, Pro-A.1, Pro-D.2, Pro-C.3 entries and first 3 ScoreBoard
   rows were left unmodified (Critical Rule 8).


----


.. _additions-session-6:

Session 6 Decisions (2026-03-21): Phase 2c — C8–C14 Integration
-----------------------------------------------------------------

*Debug log:* :ref:`debug-session-6`

1. **Review Round 1 complete (C1–C14).** All 14 Round 1 objections
   integrated into the quest with Con/Pro entries, severity/impact
   grades, and ScoreBoard rows. Round 1 Summary produced.

2. **Proto-formal status conceded and documented** (C8/Pro-F.8).
   The ``.. note::`` in ``theorems.rst`` was expanded to explicitly
   reference the proto-formal status of th5_T5–th11_T11, including the
   formalization roadmap (7TrackRole model as formal semantics). This
   is a substantive documentation change, not merely pointing to the
   quest.

3. **Compatibilism robustness note added to ax15_A15** (C9/Pro-E.9). The
   practical innovation-economy argument (th8_T8/ax25_A25) does not require
   libertarian free will specifically. Note added to canonical ax15_A15
   text for reader awareness.

4. **Secular convergence note added to th7_T7** (C12/Pro-F.12). The
   functional need for "someone willing to go first" is the same under
   secular and theological framings. Note added to canonical th7_T7 text,
   honestly stating that the theological claim (divine invitation) is
   not derivable from the mathematics alone.

5. **Mereological limits conceded at Impact G** (C10/Pro-G.10). CEM
   issues with ax1_A1–ax4_A4 are real but isolated — they do not affect the
   Jubilee system (ax15_A15–ax25_A25, th5_T5–th11_T11). No revision to ax1_A1–ax4_A4 text.
   Cross-reference labels added (``_ax1`` through ``_ax4``).

6. **No further revision to th8_T8** from C13 or C14. Phase 2b's
   substantial revisions (steps 3a–3c, revised Significance) already
   cover the negative feedback loop and "proves too much" arguments
   comprehensively. Explicitly documented as "No revision needed."

7. **Cross-reference label ``_ax15`` added** to jub/axioms.rst.
   Labels ``_ax1`` through ``_ax4`` added to pet/axioms.rst.

8. **Phase 2a–2b entries preserved** (Critical Rule 8). All existing
   7 Con/Pro entries and first 7 ScoreBoard rows left unmodified.


----


.. _additions-session-7:

Session 7 Decisions (2026-03-21): Phase 2d — C2.1–C2.6 Integration
---------------------------------------------------------------------

*Debug log:* :ref:`debug-session-7`

1. **ax19_A19-a revision executed.** Added "What ax19_A19 DOES claim (and why)"
   section to ax19_A19 in ``axioms.rst``, consolidating the fitness analogy
   defense from Pro-C.3 (Round 1) + Pro-C.2.4 (Round 2). Documents:
   (a) h* exists ontologically, (b) Reality performs scalar projection,
   (c) fitness analogy is structural, (d) epistemic identification not
   claimed. This was held back from Phase 2b pending sufficient
   combined weight from critique/response exchanges.

2. **Competitive-inhibitor model note added to th8_T8.** The Michaelis-
   Menten competitive-inhibitor model (from Pro-A.2.1) is a genuine
   structural contribution: ResearchCity introduces an alternative
   reaction pathway that competes with the MAD pathway, addressing the
   causal gap without needing to change MAD rate parameters.

3. **Commons-tragedy convergence note added to ax25_A25.** All major
   existential risks are variants of the tragedy of the commons. ax25_A25's
   Jubilee mechanism is necessary not only for preventing wealth
   concentration but for creating institutional conditions for global
   coordination (from Pro-A.2.2).

4. **Cross-reference labels ``_ax16`` and ``_ax17`` added** to
   ``axioms.rst`` (targets of C2.6).

5. **Pro-A.2.1 and Pro-A.2.2 graded at Impact A** — the competitive-
   inhibitor model and commons-tragedy convergence resolve both Fatal
   objections. The structural mechanisms (alternative pathway, all-
   pathway coordination) are the key defenses, not the debatable
   historical root-cause analysis.

6. **Pro-D.2.3, Pro-D.2.5, Pro-D.2.6 graded at Impact D** — honest
   partial resolutions. C2.3 precision objections conceded; C2.5
   research-program status conceded; C2.6 voluntariness paradox
   acknowledged as structurally real, addressed in principle but not
   proven at scale.

7. **No revision to th9_T9** from C2.5 — existing mixing-time note
   (Phase 2b) already captures the transition-probability gap.

8. **No revision to ax15_A15, ax16_A16, or ax17_A17** from C2.6 — the voluntariness
   paradox targets the axiom combination, not individual axiom text.

9. **ax25_A25-a (periodic efficiency argument) NOT executed** — the
   commons-tragedy convergence note addresses a different aspect.
   The periodic-vs-continuous comparison remains future work.

10. **Phase 2a–2c entries preserved** (Critical Rule 8). All existing
    14 Con/Pro entries and 14 ScoreBoard rows left unmodified.


----


.. _additions-session-8:

Session 8 Decisions (2026-03-21): Phase 2e — C2.7–C2.12 Integration
----------------------------------------------------------------------

*Debug log:* :ref:`debug-session-8`

1. **Review Round 2 complete (C2.1–C2.12).** All 12 Round 2 objections
   integrated into the quest with Con/Pro entries, severity/impact
   grades, and ScoreBoard rows. Round 2 Summary produced.

2. **Cross-traditional equivocation for ax25_A25 conceded** (C2.10/Pro-G.2.10).
   Added qualifying note to ax25_A25 in ``axioms.rst`` honestly acknowledging
   that only the Torah directly supports the periodic-reset mechanism.
   Other traditions support economic justice in general, not the specific
   Jubilee mechanism. Dedicated audit session required.

3. **"Everything possible" dictum withdrawn** (C2.12/Pro-F.2.12).
   The dictum is logically defective (self-undermining, infinite regress).
   Urgency argument reframed to rest entirely on RiskyMADorMAP and
   commons-tragedy convergence. No axiom/theorem revision needed.

4. **Arrow's constraint note added to ax25_A25** (C2.11/Pro-E.2.11). Arrow's
   theorem constrains Jubilee design but does not prohibit it, just as
   it constrains but does not prohibit democracy. 2-leg correction cycle
   documented.

5. **Poverty/domain-partition note added to ax18_A18** (C2.9/Pro-E.2.9).
   The poverty case shows the domain partition works for clear cases:
   person born into poverty is in D_f; responsibility belongs to prior
   agents in D_free/D_inno. Formal demarcation criterion deferred
   (capabilities theory: Sen, Nussbaum).

6. **No revision to th8_T8** from C2.8 — the rigor ladder is a meta-argument
   about epistemological status, not th8_T8-specific content. Existing notes
   (proto-formal status, illustrative-not-confirmatory) already cover
   this ground.

7. **ax25_A25-a (periodic efficiency argument) NOT executed.** The C2.7
   exchange *weakens* rather than strengthens the periodic efficiency
   case (GC analogy partially withdrawn). The periodic-vs-continuous
   comparison remains future work for ResearchCity.

8. **Cross-reference label ``_ax18`` added** to jub/axioms.rst.

9. **Phase 2a–2d entries preserved** (Critical Rule 8). All existing
   20 Con/Pro entries and 20 ScoreBoard rows left unmodified.


----


.. _additions-session-9:

Session 9 Decisions (2026-03-22): Phase 2F — C3.1–C3.7 Integration
----------------------------------------------------------------------

*Debug log:* :ref:`debug-session-9`

1. **Review Round 3 complete (C3.1–C3.7). All 33 objections now
   integrated.** All 7 Round 3 objections integrated into the quest
   with Con/Pro entries, severity/impact grades, ScoreBoard rows, and
   Round 3 Summary. Three adversarial review rounds are fully
   processed.

2. **No Fatal-severity objections in Round 3.** All 7 objections target
   ResearchCity feasibility (Se2–Se6). Zero Se1 (Mathematical Necessity)
   objections. The theoretical core was no longer contested.

3. **Paradigm-diversity note added to ax24_A24** (C3.5/Pro-D.3.5). Kuhn 1962:
   the Extensible cord requires paradigm diversity. 4-Views, ReRaft, and
   FUN are the structural mechanisms. Cross-reference label ``_ax24``
   added.

4. **No revision to ax15_A15, ax16_A16, or ax17_A17** from C3.3. The power-concentration
   objection concerns institutional design (how to implement non-coercion
   at scale), not axiom content (what non-coercion means). Adding
   implementation notes would conflate definitional axioms with
   engineering challenges.

5. **No theorem revisions needed.** No Round 3 objection targets theorem
   text. All target ResearchCity or ax24_A24.

6. **Michels' iron law (C3.3/Pro-D.3.3) identified as strongest
   unresolved feasibility concern** across all three rounds. The 7
   structural safeguards substantially mitigate the risk but cannot
   mathematically guarantee against oligarchic drift. Impact D (partially
   resolved).

7. **C3.6 (game-theoretic barriers) honestly deferred to Stage 5+.**
   The staging argument is credible, but analytical reasoning cannot
   substitute for institutional track record. Impact F (partially
   resolved / deferred).

8. **Severity-to-impact calibration verified** — all 7 entries within
   1 step of the median for their severity level.

9. **Phase 2a–2e entries preserved** (Critical Rule 3). All existing
   26 Con/Pro entries and 26 ScoreBoard rows left unmodified.


----


.. _additions-sessions-10-15:

Sessions 10--15 Decisions (2026-03-22): Phases 2G--2H
-------------------------------------------------------

Sessions 10--15 cover the multi-angle stress-test (2G-1 through 2G-3),
convergence synthesis (2G-4), OOv2 freeze (2H-1), and final
documentation (2H-2).

*Debug log:* Sessions 10--15 in the
:doc:`debug log </matheology/hell/ll/jub/b/33/jub_ll_2026m03d21_phase1-prompts-reply-overviews>`.
*Session llog:*
:doc:`/matheology/hell/ll/jub/b/35/jub_ll_2026m03d22_restructuring-2G-2H-stress-tests`.


Session 10 (2G-1): Mathematical Rigor Stress-Test
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1. **Independent mathematical review methodology adopted.** Each Se1
   resolution graded on a 4-level scale: P (Proven), S (Semi-formal),
   L (Plausible), A (Asserted).

2. **Core logical chain traced** through three links: ax24_A24 -> th8_T8
   (Grade S), th8_T8 -> ax25_A25 (Grade L, weakest link), ax25_A25 -> ResearchCity
   (Grade L).

3. **Zero P-grade resolutions.** 26% Semi-formal, 63% Plausible, 11%
   Asserted. The framework has no fully proven mathematical claims.

4. **Top-5 mathematical gaps identified:** ax25_A25 mechanism specificity,
   proto-formal th5_T5--th11_T11, 7TrackRole parameterization, ax19_A19 scalar
   projection, D_f/D_free demarcation.

5. **Effort recommendation:** Low for further adversarial critique
   (Se1 space exhausted after 3 rounds). High for constructive
   formalization.


Session 11 (2G-2): Feasibility Stress-Test
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1. **Independent feasibility review methodology adopted.** Each
   solution graded on a 4-level credibility scale: H (High), M
   (Medium), L (Low), U (Untestable).

2. **Three L-grade (Low credibility) solutions identified:** C2.2
   (root-cause convergence), C2.6 (voluntariness paradox), C3.2
   (ReRaft architecture). These rely on assumptions with no
   historical precedent.

3. **7-stage plan credibility is highly non-uniform.** Stages 0--2
   are convincing (H--M). Stage 3 is the heroic-assumption threshold
   (446x growth). Stages 5--7 require organizational success without
   precedent.

4. **Top-5 heroic assumptions ranked:** Root-cause convergence,
   voluntary participation at scale, ReRaft at planetary scale,
   stage transitions at required pace, seven anti-oligarchy mechanisms.

5. **ResearchCity is the weakest part of the framework** but the
   staged design transforms an all-or-nothing gamble into an
   incremental experiment.


Session 12 (2G-3): Disposition & Intellectual Honesty Audit
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1. **Independent disposition reassessment methodology adopted.** Each
   of 33 dispositions assessed as CONFIRMED, OVERGRADED, or
   UNDERGRADED.

2. **5 dispositions changed out of 33 (15%).** 4 downgrades (Con-A.1,
   Con-C.5, Con-A.2.1, Con-A.2.2: all Resolved -> Partially resolved),
   1 upgrade (Con-D.2.8: Partially resolved -> Resolved).

3. **Motivated reasoning concentrated at Fatal severity.** All four
   A-severity (Fatal) "Resolved" entries are overgraded. The respondent
   confused "substantial defense" with "full resolution" where stakes
   were highest.

4. **Key finding: zero fully resolved Fatal-level challenges** after
   reassessment. The framework's epistemic status shifts from
   "mathematically derived necessity" to "well-modeled empirical
   conjecture."

5. **Revised totals:** 14 Resolved / 16 Partially resolved / 3
   Conceded (original: 17 / 13 / 3).


Session 13 (2G-4): Convergence & Final Summary
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1. **Convergence matrix produced** triangulating all three stress-tests.
   Root-cause convergence (C2.1/C2.2) is the only objection flagged by
   all three angles (convergence score 3).

2. **Top-5 strongest remaining critiques ranked:** (1) Root-cause
   convergence, (2) th8_T8 bistability, (3) ax25_A25 mechanism specificity,
   (4) 7TrackRole parameterization, (5) Voluntariness at scale.

3. **Final Phase 2 Summary appended to quest.rst** with consolidated
   ScoreBoard (33 rows + audit column), statistics, and narrative
   assessment.

4. **Maturity assessment: QQ maintained** (Claude's assessment). No
   item advances to RR. Fatal-severity objections remain only partially
   resolved.

5. **10 Phase 3 priorities established** in quest.rst, with ZION/BABL
   formalization as Priority 1.


Session 14 (2H-1): OOv2 Freeze & Verification
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1. **Open items consolidated** from all Phase 2 session llogs
   (2a--2F). All items covered by the 10 Phase 3 priorities.

2. **OOv2 frozen.** Status notes in quest.rst updated. LLoL's VVN
   applied: ``iv_LLoL_OOv2r0p0_2026m03d22``.

3. **Toctree verified** in llog/index.rst: all Phase 2 session llogs
   present.

4. **Consistency check passed:** all cross-reference labels in
   axioms.rst and theorems.rst resolve, all annotations coherent.


Session 15 (2H-2): Final Documentation
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

1. **Session llog created** at
   ``llog_2026m03d22_restructuring-2G-2H-stress-tests-summary-freeze.rst``
   covering all 13 required sections.

2. **VVN attribution distinction established (CRITICAL).** StayVS VVNs
   are personal assessments by the individual who assigns them. LLoL's
   VVN (``iv_LLoL_OOv2r0p0_2026m03d22``) is authoritative; Claude's
   VVN (``dv_ClaOp46Max_QQv2r0p0_2026m03d22``) is advisory. Claude
   must NEVER attribute its own maturity assessment to LLoL.

3. **StayVS iv and dv regime explanation documented** in the session
   llog (Section 7). The ``iv_`` regime asserts long-term commitment to
   the life-trifecta; the ``dv_`` regime is recommended for developers
   who prefer maximal liberty. StayVS details are mission-critical for
   ResearchCity and tracked as a future-work item.

4. **Session decisions appended** to this plan additions file.

5. **Debug entries appended** to debug file for all 6 sessions
   (2G-1 through 2H-2) with full verbatim prompts.

6. **Phase 2 of the master plan is complete.** OOv2 provides the
   base from which LLoL will construct OOv3.


----


*This file is APPEND-ONLY. New decisions append below this line.*


.. admonition:: TELES migration report (2026m04d04)

   Mechanical identifier migration applied to this file.
   All axiom/theorem text references were migrated from short form
   (e.g., A15) to compound form (e.g., ax15_A15) as part of the
   matheology compound naming operation. Both forms refer to the
   same formal object. The old form survives as the suffix to
   ensure consistency with the oldest records; the new form adds
   a temporary-status prefix. Forward-facing pages use brief form
   (ax15) only. See
   :ref:`hell-ll-other-b15-teles-renaming-prompt` for the complete
   mapping table and :ref:`legacy-5d-link-names-table-for-pet-jub-model` for the permanent
   reference.
