.. meta::
   :description: AA b14 --- Resolve accumulated stale links (Groups 3--6) from directory restructurings, as part of the eventual jubilee transition.
   :keywords: HELL, AnyAims, stale links, structural debt, jubilee transition, link management, frozen records, annotation
   :author: Yah, Yas, everyone, LLoL as Laurence Loewe of Laodicea, ClaudeOp46Max, Anthropic, and Spirit of Boolean Truth

.. _hell-aa-b14:


***********************************************************************
AA b14 --- Resolve Stale Link Debt (Groups 3--6) at Jubilee Transition
***********************************************************************

:AIMS: k4 s1 (Todo, LongTerm)
:Status: deferred until post-papers jubilee transition
:Created: 2026m04d16
:Context: :doc:`/matheology/hell/bug/c/103/index` (bugc103),
   :doc:`/matheology/hell/ll/infra/b/11/infra_ll_2026m04d15_link-reorg-policy-llog`


Problem
=========

Directory restructurings (starting with the b15 ``intro/`` vs ``math/``
split on 2026m04d14) leave stale path references in frozen records
(llogs, executed prompts) and semi-living documents (planning docs,
scripts). The b15 restructuring alone produced 28+ stale references,
of which 14 (Groups 1--2) were fixed immediately. The remaining 14+
(Groups 3--6) are deferred.

**This is one instance of a systemic pattern.** As more papers are
restructured (the cross-paper interconnection work planned after the
Matheo papers are complete), the total stale-link count will grow.
Each restructuring compounds the annotation burden from previous ones.

See :doc:`bugc103 </matheology/hell/bug/c/103/index>` for the full
analysis of why this constitutes a micro-scale Jubilee dynamic, and
:doc:`the design proposal </matheology/hell/bug/c/103/dd-proposal-mmv1>`
for the Floor Model that resolves it.


Groups to Resolve
===================

**Group 3 (5 refs): LLogs --- append-only audit trails.**
Policy: do NOT edit the body. Add a dated path-mapping admonition at
the top of each affected file (per the two-layer Knife Edge policy).

**Group 4 (8 refs): Executed prompts --- historical records.**
Policy: same as Group 3 (annotate, do not edit body). Exception:
prompts that may be re-run should have their "Step 1: Read These Files"
paths updated, with a dated note explaining the update.

**Group 5 (5 refs): Planning/status documents.**
Policy: update paths directly (these are living documents).

**Group 6 (1 ref): Python script.**
Policy: update the hardcoded path.

**Note:** The counts above are from the b15 restructuring only. By the
time this AA is executed, additional restructurings will have added more
stale references. A full project-wide link audit should be part of the
jubilee transition procedure.


Timing
========

Execute as part of the jubilee transition (see
:doc:`dd-proposal-mmv1 </matheology/hell/bug/c/103/dd-proposal-mmv1>`,
Section 4). Do NOT execute piecemeal before the papers are complete ---
further restructurings will create more stale links, and fixing them
incrementally is churn.
